[Scaffolding Construction Achievements] Isogo Elevated Bridge

The installation period for the suspended scaffolding on the municipal road can now be limited to just two nights of nighttime work!

We would like to introduce our construction achievements for the new construction work of the Isogo Elevated Bridge (Part 1) in the "Negishi Area" along National Route 357 (Wangan Road). The Isogo Elevated Bridge spans Yokohama City Road No. 181, and to shorten the period for the installation of the suspended scaffolding on this city road, we adopted the "rack scaffolding." At the construction yard beside the city road, we assembled and lifted a scaffolding that can cover the entire width of the city road (19m in the width direction × 24m in the bridge axis direction), which was later transported onto the city road during nighttime work. As a result of this adoption, the period for the installation of the suspended scaffolding on the city road was reduced to just two nights of nighttime work. This site was adopted not as a "mobile suspended scaffolding method," but as a method that "quickly constructs full suspended scaffolding by using rails to extend the scaffolding." *For more details, please refer to the PDF document or feel free to contact us.

  • Scaffolding and Support Materials

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Isogo Viaductの関連カテゴリ